Building
Building the Tallest Tower in Qatar with iTWO
    • Tallest tower in Qatar, the 18th tallest tower in the world

    • All project stake holders need to be involved from the design phase to the execution of the project


Full End-to-End Process Management in Building Germany’s Biggest IKEA Store
    • Constructed by PORR Deutschland GmbH

    • Located in Cologne at the Butzweiler

    • 41,500㎡ earthquake-safe building

Implementation in b.i.m.m. GmbH’s Projects
    • Attained total savings of 30% by using a model-based working method and end-to-end cost control

    • Enables to predict 1:1 work process on the construction site

Infrastructure
Brenner Railway North in Austria
    • Constructed by ARGE ALPTRANSIT ENERGIE

    • One of the largest railway projects in Austria

    • Outfitting 13 sections on the Brenner North with access route in only 21 months

Miami Airport North Terminal
    • Total Value: $3.1 Billion, 39 contracts

    • Building sections include airline traffic, vehicular traffic, ticket counters, baggage space, hotel, etc.

    • $56.8Million reduction in change order

Duisburg City Palais
    • Constructed by Bilfinger Berger AG

    • 2 philharmonic concert halls in 16,000㎡

    • Constant contact between 5 GC team members and 70 subcontractors

Manufacturing
BMW Factory
    • Constructed by Lenzer + Strutz Ingenienure GmbH

    • 6 weeks earlier than planned completion date

    • Manage to move a 30-ton bridge into position with an 850-ton mobile crane

Mercedes Benz Service Centre in Milan
    • Constructed by Ed. Züblin AG

    • Largest Mercedes Benz center in Southern Europe

    • All data combined under one platform improved project transparency and cost-saving

Acoustic Center of BWM Group Aschheim
    • High-tech provides high precision for the fully anechoic chamber

    • Exact and true-to-reality measurements can only be taken by the BMW Group’s measurement and simulation software

iTWO Voice It’s YOUR opinion that counts
"The idea of 5D is absolutely crucial to the successful functioning of BIM in IT in construction."
Chris Webster – Dean of Faculty of Architecture
The University of Hong Kong
"iTWO Solution is for all the steps of the process."
Pablo Alvarez - CEO
Hermosillo y Asociados Arquitectos
"I can tell you that we need iTWO more than iTWO needs us."
Juan Carols Argeaga, Ashish Kumar
Miami International Airport